Koha Test Wiki Canasta - March 2024

One of a series of test instances for migrating the Koha Wiki MediaWiki database.

For the current Koha Wiki, visit https://wiki.koha-community.org .

General IRC Meeting 2009-12-02

From Koha Test Wiki Canasta
Jump to navigation Jump to search

Place

  1. koha IRC channel (IRC server irc.katipo.co.nz).


Time

Wednesday, 2 December 2009 at 10:00 UTC+0 .

Conversions to your local time:


Agenda

Attendees

  • gmcharlt = Galen Charlton, Equinox, RM
  • chris_n = Chris Nighswonger, FBC
  • jwagner = Jane Wagner, PTFS
  • paul_p = paul poulain, BibLibre
  • chris = Chris Cormack, Catalyst, Translation Manager
  • Colin = Colin Campbell, PTFS Europe
  • kf = Katrin Fischer, BSZ Germany
  • tajoli = Zeno Tajoli, Cilea (Italy)
  • jransom = Joann Ransom, HLT, NZ
  • Amit = Amit Gupta, Nucsoft Osslabs, Bangalore, India
  • thd =Thomas Dukleth, Agogme, New York City
  • BobB = Bob Birchall, Calyx in Sydney
  • Ropuch = Piotr Wejman, Biblioteka CSNE, Poland
  • Genji = Waylon robertson, Palmerston North, New Zealand
  • davi = Davi Diaz, software.coop
  • nahuel = Nahuel Angelinetti, BibLibre, France
  • GeorgeSue = George Sue, HLT, NZ
  • hdl_laptop = Henri-Damien LAURENT BibLibre
  • magnusenger = Magnus Enger, Libriotech, Norway
Summary
  • gmcharlt has finished merging the new acquisitions work by BibLibre into the current HEAD. **Please test thoroughly.**
  • After picking through the patch queue for remaining bugfixes and doing final merges of pianohacker's syspref stuff and chris_n's labels work gmcharlt will tag an alpha release.
  • A 3.2 branch will be created soon, allowing the HEAD to begin accepting patches for 3.4
  • Regarding the vote on wiki re-licensing, thd reports that we have we have a majority discounting all LibLime employee votes.
  • To date there have not been any dissenting votes.
  • thd has contacted SFLC for an opinion on making the re-license retroactive in-spite of not being able to contact some contributors for their approval. We are currently in the queue and it may be a week or so before we hear from them.
  • The prevailing opinion was to proceed forward with implementing the change which will probably take several weeks while waiting to hear from SFLC.
  • Two things need to be accomplished to complete the re-licensing:
    • Updating the footer to point to the GPL instead of CC-BY-NC-SA
    • Updating the signup page for new accounts to mention the new licensing
  • Some PHP coding changes will be needed which will require cooperation by LibLime in order to implement.
  • tajoli brought forward concerns about maintaining the current database documentation. These were referred to the mailing list for further discussion.
  • hdl_laptop reports that 3.0.5 is about to be released. Translations need to be updated to finalize.
  • Roles for 3.4 were tabled until the next meeting.
  • The next General IRC Meeting, 13 January 2010 is scheduled for 1900 UTC+0.